Roof replacement in Stourbridge, stripped to the rafters and rebuilt.

When repairs no longer hold, we strip the roof, check every timber and rebuild it in slate or tile with new membrane, battens and leadwork.

SURVEY
Free, with photographs
01 / WHEN TO CALL

Signs a roof is due for replacement

  1. 01
    The underlay is torn or has perished

    Old bitumen felt goes brittle. Once it fails across the roof, patching one area moves the leak to the next.

  2. 02
    Slates are slipping across the whole roof

    When the nails corrode, slates slide out one after another. Roofers call this nail fatigue.

  3. 03
    The roof line sags between the rafters

    A dip usually means the battens or timbers underneath have weakened.

  4. 04
    Tiles are flaking or crumbling

    Frost breaks down the surface of old clay and concrete tiles until they stop shedding water.

  5. 05
    You have paid for repair after repair

    Past a certain point, the next repair costs more over ten years than a new roof.

Roof re-tiled in grey concrete double-roman tiles
OAD ROOFING SITE PHOTOGRAPH

From our own jobs

OAD ROOFING SITE PHOTOGRAPHS
Roof stripped back to the rafters with the old tiles cleared, ready for new membrane
Roof stripped back to the rafters with the old tiles cleared, ready for new membrane.
Breathable membrane and new timber battens fixed across a whole roof slope
Breathable membrane and new timber battens fixed across a whole roof slope.
Hipped roof re-tiled in red interlocking tiles with dry-fixed hips
Hipped roof re-tiled in red interlocking tiles with dry-fixed hips.
1 2 3 4 5 6
FIG. 01 — PITCHED ROOF, SECTION01 / 06
02 / HOW IT IS BUILT

How a roof is rebuilt, layer by layer

  1. With the old covering off, every rafter is checked. Rotten or split timber is cut out and replaced before anything is covered up.

  2. A breathable membrane is laid from the eaves upward, each run lapped over the one below so that water sheds outward.

  3. Treated battens are fixed through the membrane into the rafters, spaced to the gauge of the slate or tile.

  4. The covering is laid course by course from the eaves, with every slate or tile nailed or clipped to BS 5534.

  5. Ridge tiles are clamped down with a mechanical dry-ridge system over a ventilated roll, so there is no mortar to crack.

  6. The fascia, eaves tray and gutter are finished so that water leaves the roof cleanly. Then we check the run-off.

03 / SPECIFICATION

Materials and standards

COVERINGS
Natural slate, clay tile or concrete tile, chosen to suit the house and the street
FIXING
Every tile and slate fixed to BS 5534, with dry-fixed ridges, hips and verges
UNDERLAY
Breathable membrane over the rafters, with ventilation at eaves and ridge where the design needs it
BUILDING REGULATIONS
Replacing a quarter or more of a roof covering normally needs approval.
04 / QUESTIONS

Straight answers.

How long does a re-roof take?

It depends on the size of the roof and the weather. The quote gives a start date and a programme.

Can we stay in the house while the work is done?

Yes. The work is outside, and the roof is covered with membrane before we leave each day so the house stays dry overnight.

Do I need Building Regulations approval?

Usually, yes. Replacing a quarter or more of the covering is notifiable, and the loft insulation may need upgrading at the same time. We explain what applies to your roof at the survey.